Project Manager - Data Centre Construction

Location Texas
Discipline: Technology
Job type: Permanent
Published: 1 day ago

Senior Project Manager โ€“ Data Centre Construction

๐Ÿ“ Location: Texas, USA (Dallas/Fort Worth or Austin preferred)
๐Ÿ“ Sector: Data Centre | Mission-Critical Construction | Hyperscale / Colocation
๐Ÿ•’ Contract Type: Full-time | Direct Hire or Contract (W2/C2C options)
๐Ÿ’ผ Employment Type: Through Petrogate โ€“ Global Technical Talent Solutions

โ€‹

About the Role

We are recruiting on behalf of a global general contractor and data centre operator for a Senior Project Manager with proven experience delivering large-scale, mission-critical infrastructure. Based in Texas, this role will lead the end-to-end delivery of hyperscale or enterprise-level data centre builds, ensuring all technical, commercial, and compliance targets are met.

This is an opportunity to join one of the fastest-growing industries in the U.S., supporting the digital infrastructure that powers cloud, AI, and enterprise computing.

โ€‹

Key Responsibilities

  • Oversee ground-up construction of data centre facilities across preconstruction, construction, and commissioning phases.

  • Manage budgets ranging from $100Mโ€“$500M, including subcontractor management, scheduling, cost tracking, and reporting.

  • Coordinate with MEP, civil, and structural trades, ensuring integration of systems such as HVAC, UPS, generators, switchgear, and BMS.

  • Collaborate with stakeholders including clients, consultants, vendors, and local authorities, ensuring compliance with all U.S. codes and safety standards.

  • Lead internal teams (project engineers, construction managers, safety officers) and mentor junior staff to deliver on schedule and within scope.

  • Ensure delivery aligns with uptime tier standards (Tier III or IV) and client-specific redundancy/availability requirements.

  • Oversee change management, RFIs, risk assessments, and client communications during the build lifecycle.

โ€‹

Required Qualifications

  • Bachelorโ€™s degree in Construction Management, Engineering, or related field (Masterโ€™s or PMP a plus).

  • 10+ yearsโ€™ experience in large-scale construction, with 5+ years in data centre or mission-critical environments.

  • Proven track record of delivering full life-cycle builds for hyperscale, colocation, or enterprise-grade data centres.

  • Familiarity with U.S. building codes, Texas energy/utility regulations, and permitting processes.

  • Deep technical knowledge of MEP systems, electrical infrastructure, fire/life safety, and critical commissioning practices.

  • Strong leadership, commercial acumen, and client-facing communication skills.

  • Able to travel to project sites across Texas or relocate during key build phases if required.

Preferred Experience

  • Experience working with or for major tech hyperscalers (e.g., AWS, Google, Meta, Microsoft).

  • Background in working with GCs, EPCs, or ownersโ€™ rep firms delivering data centre projects in North America.

  • Exposure to LEED, Uptime Institute, or ASHRAE 90.1 design guidelines.